If you’re a landlord or property manager in Worcestershire, Warwickshire, or the West Midlands, here’s something you can’t afford to ignore: the OZEV EV Chargepoint Grant for Landlords ends on March 31st, 2026. That’s just over seven weeks away.

And if you’re thinking “I’ve got plenty of time,” think again. Between the application process, installation scheduling, and the fact that every other landlord in the country just realised the same thing, slots are filling up fast.

So let’s cut to the chase: yes, you can still claim £350 per charging socket, but only if you act now.

What Is the Landlord EV Charger Grant?

The OZEV EV Chargepoint Grant is designed to help landlords and property owners install electric vehicle charging infrastructure at rental properties. The government covers 75% of installation costs, capped at £350 per socket, and you can claim for up to 200 sockets per year.

That’s not pocket change. If you’re managing a block of flats with ten units, that’s potentially £3,500 in funding. For larger landlords or housing associations overseeing multiple properties, the numbers add up quickly.

The grant was introduced to tackle one of the biggest barriers to EV adoption: renters who want to go electric but can’t charge at home. By incentivising landlords to install chargers, the government hoped to level the playing field. And it’s worked, thousands of sockets have been installed since the scheme launched.

But here’s the thing: after March 31st, it’s gone. No extensions. No second chances.

Who’s Eligible for the Grant?

Not every landlord qualifies, so let’s make sure you tick the right boxes before you get too excited.

You’re eligible if you’re:

Property types covered include:

Apartment building with EV chargers installed in dedicated off-street parking for rental properties

You’re not eligible if:

One more critical requirement: the property must have dedicated off-street parking. Street-side chargers or shared public spaces don’t qualify. If your tenants park in a driveway, car park, or private courtyard, you’re good to go.

How Much Can You Actually Claim?

Let’s talk numbers. The grant covers 75% of the total installation cost, up to £350 per socket. That means if your installation costs £500, the government pays £350 and you pay £150. If it costs £400, the government pays £300 (75%), and you cover the rest.

The sweet spot? Installations that cost around £470 per socket, where you’d pay roughly £120 and the grant covers the maximum £350.

And here’s where it gets interesting for larger landlords: you can claim for up to 200 sockets in a 12-month period. That’s a potential £70,000 in grant funding if you’re managing a large portfolio.

But: and this is important: you need to apply for each address separately. So if you own five rental properties across Worcester, Solihull, and Leamington Spa, that’s five separate applications.

Why the Deadline Matters More Than You Think

March 31st might feel like it’s still weeks away, but in reality, you’re already cutting it fine. Here’s why:

1. The 90-Day Installation Window

Once your grant application is approved, you have 90 days to complete the installation. If you apply in late February or early March, you might just squeak in. But if you wait until mid-March? You’re gambling.

2. Installer Availability

Every OZEV-approved installer in the country is dealing with the same deadline crunch. Landlords across Worcestershire, Warwickshire, and the West Midlands are all scrambling to book installations before March 31st. Slots are limited, and we’re already seeing a surge in enquiries.

3. The Government Can End It Early

Here’s the kicker: the government can change or end the scheme with just 4 weeks’ notice. They’ve done it before with other grants. If the budget runs out or priorities shift, they could pull the plug in late February, and that March 31st deadline becomes meaningless.

In short: don’t wait until March. If you’re serious about claiming the grant, get your application in now.

Why Local Expertise Matters for Multi-Unit Installs

Installing a single home charger is straightforward. Installing chargers for a block of flats or a commercial property? That’s a different beast.

You’re dealing with:

Electrical system diagram showing multi-unit EV charger installation wiring in apartment block

This is where working with a local installer makes all the difference. A national chain might send a subcontractor who’s never worked in your area. We’ve been installing chargers across Worcestershire, Warwickshire, and the West Midlands for years. We know the local building stock, we’ve worked with the DNOs in your area, and we understand the quirks of older apartment blocks and commercial properties.

For landlords managing multiple properties, we can also handle the logistics: coordinating installations across different sites, managing grant applications for each address, and ensuring everything’s done before the deadline.

Which Chargers Are OZEV-Approved?

Not all EV chargers qualify for the grant. The charger must be on the OZEV-approved list, which includes models from brands like Ohme, Zappi, Pod Point, EO, and Rolec.

We typically recommend:

All of these are 7kW units, which is the standard for home and rental property installations. They’re future-proof, tenant-friendly, and compatible with all electric vehicles.

The Application Process (It’s Simpler Than You Think)

Applying for the grant isn’t complicated, but you do need to get your ducks in a row.

Here’s the process:

1. Check Your Eligibility

Make sure you meet the criteria: registered at Companies House or for VAT, dedicated off-street parking, and using an OZEV-approved installer.

2. Get a Quote

Contact us for a fixed-price quote. We’ll assess the property, recommend the right charger, and give you a breakdown of costs.

3. Submit Your Application

You’ll need to provide:

4. Get Approval

Once approved, you have 90 days to complete the installation. We handle the technical side, claim the grant on your behalf, and you pay the remaining balance.

It’s worth noting: we manage the grant claim process for you. You don’t need to chase paperwork or deal with OZEV directly: we take care of it.

What Happens After March 31st?

After the deadline, landlords will still be able to install EV chargers: but they’ll be paying full price. No grant, no discount, no government contribution.

For a typical installation, that’s the difference between paying £150 and paying £500. Multiply that across ten or twenty units, and you’re looking at thousands of pounds in lost savings.

The government has hinted at future EV infrastructure schemes, but there’s no guarantee they’ll be as generous as the current grant. And even if a new scheme is announced, it won’t be available immediately: there’ll be a gap.

So if you’ve been on the fence about installing chargers at your rental properties, this is your last chance to do it affordably.

Ready to Claim Your £350 Per Socket?

Time’s running out, but there’s still time to act. If you’re a landlord or property manager in Worcestershire, Warwickshire, or the West Midlands, get in touch with us today for a fixed-price quote.

We’ll handle the site survey, recommend the best charger for your property, and manage the entire grant application process. No hassle, no hidden fees, and no risk of missing the deadline.

Contact EV Power Point Ltd to secure your grant before March 31st.